
Entire-Automated Squander Tyre Recycling Line to Rubber Powder
hydraulic program comma easy operation and secure time period
Mechanical description colon the tires a lot more than 800 need to have to minimize comma and reduce into 4 pieces in EPT periodthe measurement of piece is two hundred-500mm interval
Notes for using tire cutter colon
a period Examine the knives often comma if seem clear blunt comma it must be preserve well timed comma and the services is two-3 many years time period
b period of time the oil in hydraulic station must be filtered and modified routinely period of time EPTly filter as soon as every single one and 50 percent yr period of time
c time period Donning parts colon rubber seals comma shipped with another established when ship the EPT to the purchaser time period
three amp4 interval EPT tire shredEPTZPS-900
Use colon
This EPT can right crush tires smaller than 800mm tires period of time At the EPT temperature comma can be place immediately crushed into 50 ast fifty mm block comma so the next rotating can grind into ten-30 meshes or wire and fiber separation tools time period
Characteristic colon
This EPT is a compact composition comma sophisticated technology comma low vitality usage comma higher efficiency comma smashing off the examination space for the composition comma maintenance is specifically convenient semi tools with carbide surfacing technologies comma substantial hardness comma higher put on resistance comma and repeated fix employing comma so has a EPTer support daily life semi rotary display for the lattice structure of metal mesh comma blanking huge region comma enabling the screening of certified rubber period Following the partition of massive tires can achieve the influence of the very same excl
Mechanical description colon the tires of 800mm diameter and rubber ring can directly be broken into fifty ast50 mm of rubber block time period
Notes for employing EPT tire shredder colon
a interval Inject equipment oil into EPT oil lparhypoid equipment oil rpar comma major bearings use calcium-primarily based grease lubrication comma a few months soon after the operation of the EPT comma the oil should be changed and clean the fuel tank time period Given that then change the oil after time each yr period
b Soon after deal with 3 comma000 tons of squander rubber lparin normal conditions rpar commathe customer ought to grind the blade reducing edge after time time period The blades is the put on parts comma the EPT support daily life is five-6 several years comma when delivering the EPT to the customer comma the shredEPTwill be outfitted with edge hardness layer patching materials lparelectrodes rpar period
five period Double Rolls Rubber Crusher XKP-560
Use colon
Primarily utilized for crack huge rubber blocks into 40-50mm modest rubber blocks period of time
Complex parameters colon
Construction colon The rollers adopt alloy chilly tough forged irons with use-resisting comma resilient figures interval The mill flour is with tooth comma high groove period
In orEPTto lengthen the provider daily life of the cracker comma we propose create foundations for rubber cracker period
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and hard equipment floor EPT with reduced sounds and EPTer service lifestyle time period
5Our crackers are made XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with great working platforms comma all the wires will be related well from controlling technique to motor period of time When making use of the EPT comma the buyers just require to hook up right to the EPT interval
Full-Computerized Squander Tyre Recycling Line to Rubber Powder
| No period | Name | Design | Qty period of time lparQty rpar |
Motor EPT lparKW rpar | ||
| 1 | One hook debeader | LSJ-1200 | 1 | eleven | ||
| 2 | EPT tyre cutter | QDJ-1200 | one | five period5 | ||
| 3 amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | one | sixty one period5 | ||
| five | Double Rolls Rubber Crusher | XKP560 | 1 | ninety | ||
| six | Massive conveyor equipment | BCL-8 | 1 | two | ||
| 7 | Small conveyor gear | BCL-three | 1 | 1 period1 | ||
| 8 | Large Magnet separator | BMS22 | one | two period2 | ||
| nine | Modest Magnet separator | SMS-one | 1 | 1 period1 | ||
| 10 | Massive Shaking display screen | BSS-eight | one | 7 period5 | ||
| 11 | Modest Shaking screen | SSS-3 | one | 3 | ||
| 12 | Fiber separator | FS110 | one | 5 period5 | ||
| thirteen | Wonderful Rubber Powder Pulverizing EPT | XJFS-420 | four | 123 | ||
| Sq. vibrating sieve | 600 | 1 | ||||
| Rubber powder collector | JFS500 | one | 7 period5 plus0 period75 equals8 period25 | |||
| Screw conveyer | Phi200mm | 1 | period75 | |||
| Screw conveyer | Phi132mm | one | period75 | |||
| Storage pin | 1 period5cbm | one | ||||
| Hopper | one | |||||
| Belt conveyer | 1 | period75 | ||||
| 14 | Metal Baller EPT | 30T | one | seven period5 | ||
| fifteen | Rubber powder EPT EPT | 1 | three | |||
| 24 | 334 period4KW | |||||
| No | Name | model | quantity | EPT | ||
| EPT tire pre-processing comma you will get lt 50 ast50MM rubber crumb | ||||||
| one | Ring cutter | QQJ-1200 | 1 | five period5KW | ||
| two | Loop EPT | YQJ-295 | 1 | 15KW | ||
| 3 | Strip cutter | QTJ-370 | 1 | five period5 KW | ||
| 4 | Block cutter | QKJ-200 | one | 11 KW | ||
| Rubber powder processing colon you will get twenty-thirty mesh rubber powder commaat the exact same time comma different the fiber and metal wire | ||||||
| 5 | Tyre crusher | XKP400 | 1 | forty five KW | ||
| XKP450 | fifty five KW | |||||
| XKP560 | 75 KW | |||||
| six | Huge conveyor equipment | BCL-eight | one | two KW | period | |
| seven | Tiny conveyor gear | BCL-three | 1 | 1 period1 KW | ||
| 8 | Large Magnet separator | BMS22 | 1 | 2 period2 KW | ||
| nine | Small Magnet separator | SMS-1 | 1 | 1 period1 KW | ||
| ten | Huge Shaking monitor | BSS-8 | 1 | seven period5 KW | ||
| eleven | Tiny Shaking display | SSS-three | period | 1 | 3 KW | |
| twelve | Fiber Separator | FS110 | 1 | eleven KW | ||

